Vertical Stabilizer Final Assembly

DATE: 2024-08-14 TIME: 2:00

Today I started the final assembly of the vertical stabilizer by checking all the priming and placing the parts where I could get to them easily.

I also started riveting the spar doublers to the rear spar. I was not happy with some of the riveting as the rivet gun bounced on the 470 rivet heads so I drilled some of them out and replaced them. My experience so far is it is much harder to drill out 470 rivets than 426s.

Photos and some video of the day are below. I am not including a lot of video as the files are large even though I have reduced the size to 720p and increased the compression.

VS: Primed Parts On Bench, Upper Rear Spar Doubler Riveting
VS: Upper Rear Spar Doubler Riveting 1
VS: Upper Rear Spar Doubler Riveting 2
VS: Inspecting Upper Rear Spar Doubler Riveting